Midwest Data Center in WI

By implementing DoubleTrac’s advanced double-wall 2-inch piping from the basement to the 2nd floor of this Data Center, the facility can now rely on standby generators during power outages without the need for transitional sumps. The seamless flexible stainless steel piping also contributes to a 90% reduction in potential leak points and shortens installation time.

PRODUCTS

DoubleTrac 2-inch piping

DoubleTrac Elbows (90’s) & Tee’s

Custom SS Braid Jumper Hoses

Unistrut

LEARN MORE